TREPEDIA
TREPEDIA
FREE
DEMO
Licensed & Insured Approved

Railings

Railing Construction

Railings can be very versatile – TREPEDIA works in 3 steps to quickly create production drawings.

See how fast it works

Railings can vary greatly in both layout and design. TREPEDIA works here in 3 steps. The goal is to obtain production drawings as easily and quickly as possible.

Installation Situation

Using the control buttons, a line is generated that reflects the course of the railing. Alternatively, a floor slab can be created, after which the railing sides can be defined.

Installation situation

Pattern

In the second step, you select one of the already saved patterns or create a new one. Here, the execution of the corners and the type of fastening are also defined.

Pattern

Execution

In the final step, the chosen pattern is applied to the installation situation. Finally, posts can still be adjusted, for example.

Execution